You would not build a house by hiring a project manager, a procurement specialist and a general building contractor, then asking them to work out the plumbing, wiring and structural calculations between themselves.
You would employ an architect to design the building, a structural engineer to determine whether it would remain standing, an electrician to make it safe, a plumber to make it usable and a building inspector to ensure that it complied with the relevant regulations.
Yet organisations routinely approach major IT projects in precisely the opposite way.
They assemble a steering committee. They appoint a project manager. They involve procurement, finance and representatives from the business. They purchase an application from a reputable supplier. They may even hire a large consultancy.
But nobody on the client side has the technical knowledge to determine whether the proposed solution is scalable, secure, compatible with the existing environment or capable of satisfying the organisation’s regulatory obligations.
The project is fully staffed, but technically ownerless.
An IT project is more than a software purchase
One reason this happens is that senior management often sees an IT project as the purchase and installation of an application.
The assumption is that the supplier understands the technology, the business understands its requirements and the project manager will coordinate the two.
That arrangement may work for a small, standardised product. It is dangerously inadequate for a major transformation programme.
A significant IT project usually involves:
- changing business processes;
- transferring and reconciling data;
- integrating several existing systems;
- redesigning controls;
- managing access and security;
- producing management and regulatory reports;
- retiring or modifying legacy applications;
- training users;
- changing responsibilities;
- and maintaining essential services while the work is completed.
The application is only one component.
Installing new software into an undocumented, unnecessarily complicated operating environment is like delivering a prefabricated house to a site where nobody has surveyed the land, marked the boundaries or checked whether water and electricity are available.
The product may be perfectly serviceable. The project can still fail.
The house-building analogy
The different specialists involved in an IT project can be understood by comparing them with the people required to construct a house.
The enterprise or solution architect
The architect designs how the principal components should fit together.
This person considers the organisation’s existing systems, future strategy, security requirements, integration points, data flows, cloud or infrastructure model and the consequences of different design decisions.
The architect should be able to answer questions such as:
- Will the application fit within the existing technology estate?
- Which systems will provide its data?
- What will happen when transaction volumes increase?
- How easily can it be changed?
- What dependencies will it create?
- Will the organisation become locked into one supplier?
- Can the solution be supported after the implementation team leaves?
Without an architect, individual components may work while the overall design remains incoherent.
The technical lead and developers
A technical lead converts the architecture into an implementable design and provides technical direction to the development team.
Full-stack developers can understand how the user interface, business logic, APIs and database interact. They are particularly valuable because they can see how a change in one part of an application affects another.
However, “full stack” should not be interpreted as “expert in everything”. A full-stack developer should not automatically be expected to replace a security architect, database specialist, cloud engineer, regulatory expert or data architect.
A builder may understand how an entire house is constructed. That does not make the builder a certified electrician, structural engineer and building-control inspector.
The database and data specialists
A database specialist considers how information will be stored, accessed, protected, backed up and recovered.
A data architect determines how information is defined and organised across the business. A data engineer builds the processes that move and transform it. A data-quality specialist establishes checks to ensure that it remains accurate, complete and consistent.
These roles become critical when an organisation has multiple systems using different definitions for apparently simple terms such as “customer”, “balance”, “default”, “revenue” or “exposure”.
Without this expertise, the new application may merely reproduce the inconsistencies of the old environment in a more expensive form.
The integration specialist
Modern applications rarely operate independently.
An integration or API specialist determines how the application will communicate with customer systems, financial systems, data platforms, identity services, document repositories and external providers.
Poor integration design results in manual workarounds, duplicate data, reconciliation problems and processes that fail whenever one system changes.
This is the digital equivalent of completing a house and then discovering that its pipes do not connect to the public water supply.
The security specialist
A security specialist considers authentication, access rights, encryption, monitoring, vulnerabilities, incident response and the protection of sensitive information.
Security cannot be added shortly before launch through a penetration test. It must influence the architecture, data model, hosting arrangements and operating procedures from the beginning.
The security specialist performs part of the role played by the electrician and building inspector: ensuring that something which appears functional is not concealing a serious hazard.
The cloud and infrastructure specialists
Cloud engineers, infrastructure engineers and network specialists determine where the application will operate and how it will remain available.
They consider capacity, connectivity, resilience, backups, disaster recovery, monitoring, performance and the practical consequences of failure.
A system that functions during a demonstration may still be unsuitable for production if it cannot cope with peak demand, recover from an outage or operate when a dependent service becomes unavailable.
The reporting and business-intelligence specialists
Reporting is frequently treated as the final stage of a project.
It should be considered during the design of the data model.
A reporting or business-intelligence specialist determines what management information, operational reports, audit evidence and regulatory returns will be required. This affects which data must be captured, how it must be categorised and how historical changes must be retained.
When reporting specialists arrive late, they often discover that the application does not store the information needed to produce the promised reports.
The user-experience and service-design specialists
A user-experience specialist considers how people will actually interact with the system.
A service designer looks beyond individual screens and examines the complete process, including hand-offs, exceptions, approvals, customer communications and work performed outside the application.
Without these roles, organisations can successfully automate a badly designed process.
The system may meet its written specification while making the work slower, more confusing and more dependent on spreadsheets.
The business analyst and subject-matter experts
A business analyst translates business needs into clear, testable requirements.
Subject-matter experts understand the underlying activity: lending, insurance, healthcare, payroll, logistics, taxation or whichever process is being changed.
The business analyst should challenge vague requests and identify exceptions, dependencies, controls and conflicting requirements.
The analyst is not simply a minute-taker. Nor should subject-matter experts be expected to design a technical solution without support.
The regulatory and compliance specialists
In a regulated organisation, the relevant rules form part of the design specification.
The regulatory specialist must determine which obligations affect the application, its data, its controls, its documentation and its reports.
This expertise is particularly important in banking. BCBS 239 and the European Central Bank’s expectations for risk data aggregation and risk reporting, commonly described as RDARR, address governance, data architecture, accuracy, completeness, timeliness, adaptability and reporting capabilities. They are closer to building regulations than to an optional compliance checklist.
They cannot sensibly be considered after the application has been selected and its architecture established.
The change specialist
Most major IT programmes are business-change projects with a technology component.
A change manager considers how roles, responsibilities, procedures, training, communications and working practices must change for the system to succeed.
The change specialist also assesses whether the organisation is ready to implement the application.
A technically sound product introduced into an undocumented and unreformed environment will inherit the disorder of that environment.
The testing and quality-assurance specialists
Testing is not simply asking several users to click through the system before launch.
Specialists may be needed for functional testing, integration testing, performance testing, security testing, data-migration testing, disaster-recovery testing and user acceptance.
Quality assurance should also determine whether requirements are testable and whether evidence exists to demonstrate that they have been satisfied.
The commercial and vendor-management specialists
A supplier’s proposal must be challenged by an informed customer.
Commercial and vendor-management specialists establish deliverables, acceptance criteria, responsibilities, milestones and remedies. They must work alongside technical experts who understand what the contract is purchasing.
Otherwise, the supplier may deliver exactly what the contract describes while the organisation fails to receive what it actually needs.
The warning that was ignored
Consider an anonymised change programme undertaken by a bank in response to regulatory feedback.
During the procurement process, prospective applications were assessed through a request for proposal. One of the applications had a fixed limit on the number of data points it could support.
The limitation was raised during the process, but it was questioned rather than treated as a potentially fundamental problem.
To someone without a technical background, a data-point limit might appear to be an obscure product detail. To an experienced architect, developer or data specialist, it should immediately prompt further investigation.
Why did the limit exist?
Was it a licensing restriction, a database limitation or a weakness in the product’s design? Could the limit be increased? What would happen as the organisation added new products, reports, entities, time periods and regulatory requirements? Would the system have to be redesigned or replaced?
An application intended to manage risk information must be capable of evolving as the institution, its data and its regulatory obligations change.
The bank purchased the application.
The hard limit subsequently prevented it from becoming a genuinely scalable solution.
The problem was not that nobody mentioned the restriction. The problem was that nobody with sufficient technical authority recognised its significance and insisted that it be resolved before the purchase was approved.
Regulation was treated as a later workstream
The same programme did not include anybody with a sufficiently detailed understanding of the regulatory standards applying to risk data and reporting.
That omission affected much more than the compliance documentation.
Regulatory expectations should have influenced:
- the application architecture;
- data ownership;
- data lineage;
- reconciliation controls;
- historical records;
- adjustment processes;
- audit trails;
- reporting flexibility;
- data-quality measurements;
- and the ability to produce information accurately and quickly during periods of stress.
BCBS 239 was introduced after the global financial crisis exposed the inability of major banks to aggregate risk exposures completely, accurately and quickly. More than a decade later, supervisors continue to report weaknesses in governance, IT architecture, data quality and reporting capabilities.
This is not a problem that can be solved by adding a regulatory workstream shortly before implementation.
If the foundations do not support the applicable standards, additional reports and controls will merely conceal the weakness temporarily.
The organisation was not prepared for the application
There was also no experienced change lead with the authority to prepare the organisation for implementation.
Requirements were poorly written. The existing environment was not adequately documented. Processes had not been simplified. Dependencies and data sources were not fully understood.
Instead of first determining how the organisation should operate, the project attempted to insert the purchased application into the existing complexity.
This is a common mistake.
An application cannot decide which of several conflicting business processes is correct. It cannot resolve unclear ownership. It cannot determine which spreadsheet contains the authoritative figure. It cannot persuade departments to adopt consistent definitions.
Technology can automate decisions that the organisation has already made.
It cannot make those decisions on the organisation’s behalf.
This pattern is not confined to banking
In one publicly documented programme, a government department attempted to create a national control system for an essential emergency service.
The department lacked the necessary IT, programme-management and business-change expertise. It became heavily dependent on consultants but lacked the internal capability to manage or challenge them effectively. The technology was more complex than initially understood, the contract was poorly designed, and the main contractor had no direct experience in the relevant operational sector.
Buildings were completed, but the required computer system was never successfully delivered.
In another case, a public healthcare body accepted a national data-extraction system that was subsequently found to contain fundamental design flaws. The complete system had not been properly tested before acceptance. It began operating years later than planned, cost substantially more than originally expected and was still unable to provide the full intended service.
These programmes operated in different sectors, but the underlying failure was similar: the customer did not possess enough internal technical capability to act as an intelligent client.
The supplier knew its product and contract.
Nobody on the client side understood the complete problem well enough to challenge the proposed solution.
A 2025 audit of 29 major public-sector IT projects in one jurisdiction found that approximately 58 per cent of live projects were rated red or amber. The report identified insufficient skilled resources, poorly understood complexity, unrealistic estimates and project teams that lacked important technical, data and change capabilities.
The lesson is not that every organisation must employ every possible specialist permanently.
The lesson is that the necessary expertise must be available at the point when important decisions are made.
Some experts may only be needed for several days
Organisations often respond that it would be too expensive to include all these specialists.
That objection confuses access with permanent employment.
A security architect may be required for several days during the initial design and again before launch. A database specialist may be needed to review the proposed data model. A regulatory expert may assess the requirements and control framework. An integration specialist may examine the interfaces before the contract is signed.
Several days of independent expertise can prevent years of remediation.
However, rigid hiring and procurement policies frequently make this difficult. An organisation may be permitted to hire a permanent employee or purchase a multimillion-euro application, while being unable to engage an independent specialist for five days.
Recruitment may take months. Approved job descriptions may not reflect the expertise required. Day rates may be rejected as excessive even when the total cost is insignificant compared with the project budget.
The result is a peculiar form of false economy: the organisation saves thousands on specialist advice and subsequently spends millions correcting decisions that the specialist might have challenged.
What the project should have done
Before issuing the RFP, the organisation should have completed a skills assessment.
It should have identified the expertise needed to understand:
- the current environment;
- the target operating model;
- the future architecture;
- data volumes and growth;
- scalability;
- security;
- integrations;
- reporting;
- regulatory obligations;
- data migration;
- change readiness;
- and ongoing support.
The project should then have appointed an independent technical design authority with the ability to challenge both the supplier and the internal project team.
Unusual product constraints should have been investigated through demonstrations, proof-of-concept exercises and volume testing. Requirements should have included non-functional matters such as performance, capacity, adaptability, auditability, recoverability and supportability—not merely a list of screens and functions.
The regulatory framework should have been incorporated into the architecture and requirements from the beginning.
The existing environment should have been documented and, where possible, simplified before implementation.
Most importantly, the organisation should have been willing to pause the procurement when a fundamental concern remained unresolved.
The person who can say “stop”
IT projects do not fail solely because they lack talented people.
They fail because the right expertise is absent when irreversible decisions are made—or because the expert has no authority to challenge those decisions.
A project manager may report that every task is on schedule. Procurement may confirm that the process was followed. The supplier may demonstrate that the application satisfies the contract. The steering committee may note that the project remains within its approved budget.
None of that proves that the organisation is building the right system.
Every major project needs somebody with sufficient knowledge, independence and authority to examine the proposed design and say:
This will not scale.
This will not integrate.
This will not satisfy the regulation.
This environment is not ready.
These requirements are not good enough.
We should not sign this contract.
That challenge may delay the project by several weeks.
Ignoring it may delay the organisation by several years.